Bingham, E, Gibson, G E and Asmar, M E (2018) Measuring User Perceptions of Popular Transportation Project Delivery Methods Using Least Significant Difference Intervals and Multiple Range Tests. Journal of Construction Engineering and Management, 144(06).

Chang, C and Yu, S (2018) Three-Variance Approach for Updating Earned Value Management. Journal of Construction Engineering and Management, 144(06).

de la Garza, J M and Pishdad-Bozorgi, P (2018) Workflow Process Model for Flash Track Projects. Journal of Construction Engineering and Management, 144(06).

El-adaway, I H, Abotaleb, I S, Eid, M S, May, S, Netherton, L and Vest, J (2018) Contract administration guidelines for public infrastructure projects in the United States and Saudi Arabia: comparative analysis approach. Journal of Construction Engineering and Management, 144(06), 04018031.

Guo, H, Yu, Y, Ding, Q and Skitmore, M (2018) Image-and-Skeleton-Based Parameterized Approach to Real-Time Identification of Construction Workers’ Unsafe Behaviors. Journal of Construction Engineering and Management, 144(06).

Ham, N, Moon, S, Kim, J and Kim, J (2018) Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L Project. Journal of Construction Engineering and Management, 144(06).

Han, Y, Li, Y, Taylor, J E and Zhong, J (2018) Characteristics and Evolution of Innovative Collaboration Networks in Architecture, Engineering, and Construction: Study of National Prize-Winning Projects in China. Journal of Construction Engineering and Management, 144(06).

Kosonen, H K and Kim, A A (2018) Mental Model Approach to Wastewater Treatment Plant Project Delivery during Emergency Response. Journal of Construction Engineering and Management, 144(06).

Kwon, N, Song, K, Lee, H, Kim, J and Park, M (2018) Construction Noise Risk Assessment Model Focusing on Construction Equipment. Journal of Construction Engineering and Management, 144(06).

Liu, D, Lu, W and Niu, Y (2018) Extended Technology-Acceptance Model to Make Smart Construction Systems Successful. Journal of Construction Engineering and Management, 144(06).

Liu, X, Song, Y, Yi, W, Wang, X and Zhu, J (2018) Comparing the Random Forest with the Generalized Additive Model to Evaluate the Impacts of Outdoor Ambient Environmental Factors on Scaffolding Construction Productivity. Journal of Construction Engineering and Management, 144(06).

Liu, Z, Wang, H and Li, H (2018) Model of Equipment Sharing between Contractors on Construction Projects. Journal of Construction Engineering and Management, 144(06).

Nzabonimpa, J D and Hong, W (2018) Novel Precast Erection Method of Interlocking Mechanical Joints Using Couplers. Journal of Construction Engineering and Management, 144(06).

  • Type: Journal Article
  • Keywords: Precast concrete frames; Fully restrained moment; Column-column joint; Couplers; Erection of precast frames; Precast columns connected with metal plates; Erection method using interlocking mechanical joints;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001482
  • Abstract:
    Despite many advantages of precast concrete members, the conventional precast members lack in the treatment of construction waste, require concrete pour forms at joints, and their structural discontinuity leads to low redundancy in the load paths. This study aims to provide novel solutions to these problems by developing interlocking mechanical joints with fully restrained moments for the connections of both steel-concrete composite precast and reinforced concrete precast columns. In the proposed connections, a pair of steel plates was provided; each plate was installed at the bottom of the upper columns and on top of the lower columns, which were then connected monolithically via vertical column rebars passing through the metal plates, providing flexural capacity similar to that of conventional monolithic column connections. The column rebars were spliced by couplers that were manufactured to be fastened by the weight of the upper column, which was heavy enough to push the vertical rebars into the couplers in the area prepared at the lower part of the upper column, providing a monolithic joint for the connected precast columns. Throughout the erection test, it was found that conventional monolithic cast-in-place joints for assembling precast concrete frames can be replaced by the interlocking mechanical joints, offering rapid erection compared with traditional practices. The columns with proposed joints were also proved to demonstrate sufficient structural capacity. Stresses and strains were found within allowable limits on the basis of finite-element analysis considering concrete plasticity during the assembly of heavy precast frames. The erection test showed sufficient verticality ensuring rebars to be connected via couplers when the upper columns were released down to the lower columns. This novel frame did not require concrete cast at the joint, eliminating the use of concrete pour forms adopted in conventional construction methods over the last years. Effortless erection with structural efficiency was demonstrated by using the proposed assembly method, with a significant reduction in the time required to assemble precast frames, similar to that of steel frames. The novel frames proposed in this study are expected to replace the conventional concrete frames including cast-in-place frames and precast frames with traditional joints. These novel frames contribute to the concrete industry by providing rapid and dependable construction of both precast and cast-in place frames.

Rahimi, Y, Tavakkoli-Moghaddam, R, Iranmanesh, S H and Vaez-Alaei, M (2018) Hybrid Approach to Construction Project Risk Management with Simultaneous FMEA/ISO 31000/Evolutionary Algorithms: Empirical Optimization Study. Journal of Construction Engineering and Management, 144(06).

Raoufi, M and Fayek, A R (2018) Key Moderators of the Relationship between Construction Crew Motivation and Performance. Journal of Construction Engineering and Management, 144(06).

Shaofeng, L, Jincai, F, Pinghua, Z and Xiang, L (2018) Stability Analysis of Two Parallel Closely Spaced Tunnels Based on Convergence–Confinement Principle. Journal of Construction Engineering and Management, 144(06).

Sherratt, F, Welfare, K, Hallowell, M and Hoque Tania, M (2018) Legalized Recreational Marijuana: Safety, Ethical, and Legal Perceptions of the Workforce. Journal of Construction Engineering and Management, 144(06).

Vaux, J S and Kirk, W M (2018) Relationship Conflict in Construction Management: Performance and Productivity Problem. Journal of Construction Engineering and Management, 144(06).

Walters, J P, Kaminsky, J and Huepe, C (2018) Factors Influencing Household Solar Adoption in Santiago, Chile. Journal of Construction Engineering and Management, 144(06).

Yoon, S, Kang, K, Yoon, Y, Hastak, M and Ji, R (2018) Systematic Decision-Making Process for Composite Pavement Maintenance. Journal of Construction Engineering and Management, 144(06).

Yu, J and Leung, M (2018) Structural Stakeholder Model in Public Engagement for Construction Development Projects. Journal of Construction Engineering and Management, 144(06).

Zhao, T, Liu, W, Zhang, L and Zhou, W (2018) Retracted: Cluster Analysis of Risk Factors from Near-Miss and Accident Reports in Tunneling Excavation. Journal of Construction Engineering and Management, 144(06).